Rent Lisabon from 2 950 €/month - Flatio
as a Guest as a Host as F4B
+ Stay Benefits StayProtection

Fantastic Penthouse with Private Roof Top Terrace

2 people
1 Bedroom
1 Bathroom
270 m2
7th floor
Wi-Fi
Furnished
avg. 2 950 
/ 30 days
incl. utilities and internet
StayProtection
Stay Benefits

Your stay in this living space will be covered by our StayProtection package, with Stay Benefits included for all bookings under 180 days! Read more

Flat for rent - Lisabon

Fantastic, and one of a kind, penthouse of the entire top floor of a building with wrap around 360 views. The flat comes with a fantastic terrace, with outside dining and lounge area. 1 Bedroom and open area living room with a sofa bed that can accommodate a 3rd and 4th person. 2 Bathrooms (one en-suite and one guest bathroom with toilet). Fully equipped kitchen with stove, oven, SMEG Fridge, washing machine, dishwasher. Flat screen TV and flat is accessible by two lifts.

Show more
Welcome package

Welcome suprise package can be expected and won´t disappoint you!

Internet speed for your remote work or entertainment

Download

163 Mbps

Upload

124 Mbps

The internet speed was independently verified by SPEEDTEST logo See the results

Equipment
Basic furniture
Sofabed
Sofa
Chair
Dining table
Coffee table
Desk
Wardrobe
Dresser
Walk-in closet
Cabinet
Mirror
Bedding amenities
Bedding
Mosquito net
Laundry essentials & Linen supplies
Washing machine
Towels
Dryer machine
Iron
Ironing board
Clothes drying rack
Cleaning options
Sponge for dishes
Broom
Mop
Bucket
Dishwashing liquid
Cleaning cloth
All-purpose cleaner
Vacuum cleaner
Robotic vacuum cleaner
Regular cleaning service (included in rent)
Kitchen essentials
Utilities for eating
Utilities for cooking
Glasses
Mugs
Freezer
Fridge
Microwave oven
Oven
Dishwasher
Electric kettle
Toaster
Blender
Coffee maker
Slow cooker
Hotplate
Gas cooker
Electronic devices
Air conditioning
Mobile air conditioning
Apple TV
Chromecast
TV
Beamer/projector
Hairdryer
Water heater (boiler)
Wine cooler
Ice maker
Playstation
Xbox
Nintendo
Other gaming console
Robotic lawn mover
Lawn mover
Printer
Scanner
Building matters
Balcony
Terrace
Central heating
Electric heating
Something for the kids
Baby crib
Bed for children
High chair
Electronic babysitter
Breath monitor
Stroller
Toilet seat
Potty
Baby bath
Changing table
Stool
Toys
Playground (outdoor)
Security features
Security lock
Security enter door
Smoke detector
CO detector
Vault
Standard door lock
Window insect screens
First-aid kit
Subscriptions (included in price)
Cable TV
Netflix
HBO MAX
Amazon Prime
Apple TV+
Disney+
Hulu
YouTube TV
Spotify
Breakfast
Something little bit extra
Fireplace
Billiard
Barbecue
Swimming pool
Wooden barrel hot tub
Jetted whirlpool hot tub (jacuzzi)
Sauna
Bikes
Accessibility
Wheelchair access
Elevator
Shower grab bar
Shower seat
Shower chair
Stair lift
Show more
Parking
Paid public parking nearby
1 minute on foot
Free public parking nearby
1 minute on foot
Rooms and equipment
Shower icon
Bedroom
21 m2
Not walk-through
Private bathroom
Living room icon
Living room
Show equipment
Kitchen icon
Kitchen
Rental conditions
Average rent per 30 days
2 950 
Utilities and internet
Included in the rent
Rental length
Minimal rent length
30 days
Maximal rent length
360 days
Available from
04.04.2026
Rules
Smoking forbidden
Pets forbidden
Parties forbidden
Move-in and move-out times
Move-in time
15:00
Move-out time
10:00
StayProtection for Guests

Every time you rent through Flatio, you're automatically covered by our StayProtection package.

  • Move-in Guarantee
    ensuring you'll always have a place to stay, even if everything doesn't go as planned
  • Balanced visa-friendly lease agreement
    providing equal rights and adding great flexibility to your stay
  • Deposit-free policy
    eliminating the financial burden of hefty upfront deposits
  • 100% money protection
    which guarantees your transactions are always secure and free from scams
  • 7 days a week support
    that is here for you throughout your whole rental experience
Stay Benefits*

By booking this living space under 180 days, you'll also enjoy extended protection in the form of Stay Benefits - a unique offering backed by AXA! Here's what such packaging includes:

  • Liability insurance
    covering you in case you accidentally cause any damages
  • Assistance services
    for any potential issues during your stay, such as disruptions in internet service, utility faults (electricity, gas, heating), blocked-up door, or household appliance malfunctions

*Please note that these extraordinary Stay Benefits do not extend to bookings exceeding 180 days. For these longer-term stays, this host requires deposit-based coverage instead.

Cancelation policy
Strict (30-days)
You can cancel the booking for free within 30 days before moving. Read more detailed cancelation policy.
Final prices. You don't pay any hidden fees on Flatio. All utilities and Wi-Fi are already included in the rent.
Cancel for free. There is a Strict (30-days) cancelation policy for this listing. Read the cancelation policy
Move-in Guarantee. We'll cover a back-up accommodation up to 7 days if the living space is not alright. Read more
Verified lease agreement. Read the lease online and comfortably from your home. Read the contract
About host
Hugo S.
On Flatio since September 2023
Message response time: -
Approval rate: -
Booking response time: -
Hi, my name is Hugo. This is my home. I have spent countless hours personally renovating and decorating the flat, to make your stay pleasent and memorable (as if I would live there), using my own personal selected items. I would love you to feel at home and confortable in this unique space with the most amazing views of downtown Lisbon. Please cherish and take good care of it, as if it was your own. Looking forward to have you with us!
More about host
Where you will live
Underground
5 minutes
Public transport
5 minutes
Public transport - evening
5 minutes
Grocery store
1 minute
Bar
5 minutes
Restaurant
5 minutes
Post office
8 minutes
Hospital
10 minutes
Emergency services
10 minutes
Pharmacy
4 minutes
Frequently asked questions for this listing
How far is it to the nearest public transport stop?
Public transport is 5 minutes on foot, night public transport is 5 minutes on foot. Also see the availability of other nearby services.
Does the property have Wi-Fi?
Yes, this housing has Wi-Fi.
What is the minimum lease length?
The minimum lease length is 1 month. See other conditions of rental.
What is the maximum lease length?
The maximum lease length is set to 12 months. See other conditions of rental.
6 reasons why to choose this offer on Flatio
No more personal visits, no more stress or disappointment! You deal with the whole renting process immediately.
We have personally checked this owner.
You get Flatio support for the whole duration of your rent.
The whole contract is available for you before booking.
The payment is completely safe. You can pay by card.
Compared to real estate agencies you'll save on average 400 EUR.
FAQ
What happens after I make a booking?

Once you send a booking request, the host is notified that you are interested in their listing. From that moment, they have 24 hours to approve or reject your booking.

Hosts are mainly interested in the profile of their guest. Do not forget to fill in all necessary information, add your profile picture, or even make a short video about yourself. Doing that will make you more attractive for the owner and your booking will more likely get approved.

What is the standard furnishing of flats?
All the properties listed on Flatio must meet certain standards. We require fully furnished and equipped ones, dishes, cutlery and Wi-Fi included. In rare cases, a property may not offer Wi-Fi — this is always clearly stated on the listing page.
What is a medium-term rent?
The duration of a medium-term rent is usually 1 to 12 months. Most of the hosts offer long-term rents or rents for just a few days, therefore getting a medium-term rent without Flatio is not that easy.
Can I go through the contract before I make a booking of the housing?

You can take a look at the contract in advance and online with every listing. After you sign it, you will find it in the application My Housing.

While arranging a contract on Flatio, you do not have to worry that it could be disadvantageous for you. Our contracts are made so that we avoid all problems! All of them are the same, used by all the hosts on Flatio.

Can I see my chosen accommodation in person before I sign the lease agreement?

Your time is precious. That's why we've added a virtual tour option to our platform so you can see some of the rentals listed on Flatio from the comfort of your own home.

If a virtual tour isn't available for the accommodation you've chosen, you can contact the host and ask them if they're willing to give you a personal tour of the rental unit.

In the event that you move in and the rented accommodation doesn't match the information on Flatio, let us know as soon as possible!

If the conditions for the withdrawal are met and the host can't fix the issue immediately, you have the option to withdraw from the lease agreement with a full refund. We'll also actively help you find an alternative accommodation and remain by your side until everything is fully resolved.

You can read the conditions and all details about our Move-in Guarantee in this article of our Help Center.

How can I pay?
On Flatio, you have a variety of payment methods to choose from. You can use your card, payment gateway or bank transfer. Just pick the one which suits you the most.
How can I cancel my booking?

How you can cancel a booking varies depending on what stage the booking is in.

Is your booking request still waiting for host approval? Then you can simply cancel it directly from your My Housing web app!

However, suppose the owner has already approved your booking request, and you are no longer interested in it. In that case, you can still cancel the booking before you sign the lease agreement. Just consider that you should do this only in essential cases. Because when the host accepts your booking, the living space is stopped being advertised, and they can lose the chance to rent their property to someone else.

Do you have an approved booking and also a valid agreement? In order to cancel your booking, contact Flatio customer support well in advance of your contract beginning (the specific time and amount of refund depends on the type of cancelation policy).

Other living spaces you may like
+ Stay Benefits StayProtection + Stay Benefits Verified by guest Guest-Verified
Apartment in Lisabon WiFi 540/110 Mbps · Charming studio inside Lisbon’s castle walls
4. 4. – 8. 4. (4 nights)
110 € / night
All utilities included · No deposit
+ Stay Benefits StayProtection + Stay Benefits Verified by guest Guest-Verified
Apartment in Lisabon Alegria Apartment
26. 4. – 9. 5. (13 nights)
93 € / night
All utilities included · No deposit
Apartment in Lisabon WiFi 500/100 Mbps · Central (Estrela Garden) T1
15. 4. – 19. 4. (4 nights)
90 € / night
All utilities included · No deposit
+ Stay Benefits StayProtection + Stay Benefits Verified by guest Guest-Verified
Apartment in Lisabon Charming apartment in the center of Lisbon
4. 4. – 3. 5. (29 nights)
85 € / night
All utilities included · No deposit
Make a booking request
Cookies settings on Flatio

We use cookies, including third-party cookies, to operate this marketplace with monthly stays. In addition to the operational ones necessary for the actual functioning of Flatio, we also use preferential, analytical, and marketing cookies. By clicking on Customise Cookies, you can decide on each category or refuse all cookies other than the basic ones. In addition, you can read detailed information on a particular page dedicated to the privacy of our visitors and clients.

You can change your cookie settings at any time and, of course, refuse all optional cookies if you prefer.
Customise Cookies